Novgorodenergo branch of IDGC of the North-West having carried out an array of measures for technological connection of the new “Kristall” artificial ice stadium (area – 3480 sq. m) in Valday to electric power supply.

24.02.2012

Novgorodenergo branch of IDGC of the North-West having carried out an array of measures for technological connection of the new “Kristall” artificial ice stadium (area – 3480 sq. m) in Valday to electric power supply. Two 10 kV overhead transmission line with total length equal to 7 km have been constructedDirector of Novgorodenergo branch of IDGC of the North-West Vladimir Chistyakov took part in solemn ceremonial opening of “Kristall” ice stadium in Valday (Novgorod Region). Construction of the new sporting facility with an area of 3480 sq. m began in January 2009. “Kristall” is a large health and fitness complex with tribunes capable to accommodate 292 spectators, an artificial ice arena with an area of 1456 sq. m, constructed under program “Gazprom to Children”.
Novgrodenergo has carried out the complete range of measures for the social facility technological connection to electric power supply. One has constructed two 10 kV overhead transmission line with total length equal to 7 km.  Deputy Head of the region administration Arnold Shalmuyev and Deputy General Director of Gazprom Transgaz, LLC thanked the IDGC of the North-West branch specialists for prompt high quality work.