09.02.2012
95% of the contracts executed in 2011 dealt with performance of technological connection of the applicants’ power units with capacity up to 15 kW (113.7 MW in total).In 2011, IDGC of the North-West, JSC executed 12,745 contracts for performance of technological connection with a total capacity of 237.8 MW, which includes contracts upon 4,844 current year requests (63.2 MW). 95% of the contracts executed in 2011 dealt with performance of technological connection of the applicants’ power units with capacity up to 15 kW (113.7 MW in total).
In 2010, IDGC of the North-West executed 8,229 contracts for performance of technological connection with a total capacity of 157.8 MW. This is inclusive of 7,607 contracts for performance of technological connection of the applicants’ power units with capacity up to 15 kW (62.4 MW in total). Proceeds from the technological connection service in 2011 made 883.8 mln RUR (VAT excluded). In the same period of 2010, proceeds from the technological connection services made 668 mln RUR (VAT excluded).