04.07.2013
The total cost of the project amounts to approximately 260 mln RUB.
The festive launch ceremony took place on July 3 in Petrozavodsk. Available at 110/10 kV Logmozero substation is all the infrastructure required. Thus one has provided for the power supply needs of Kalevala woodworking integrated plant and the possibility to connect additional loads within the Prionezhsky District of the Republic of Karelia. The total cost of the project amounts to approximately 260 mln RUB.Head of the Petrozavodsk Urban District Nickolay Levin handed over letters of gratitude to Karelenergo Director Yefim Ashkinezer and the employees of the group of substations of Southern Karelia Electric Power Grids production division.