01.11.2012
As compared to the previous year, performance remained at the same level. In the 9 months of 2011, supply of electric energy into IDGC of the North-West, JSC grid made 31,596.6 kWh. Productive supply of electric energy across the Company's grids made 29,737.7 mln kWh. As compared to the previous year, performance remained at the same level. The recorded transmission losses amount to approximately 5.88% (following the outcome of the same period of the previous year, they were equal to 5.96%).Electric energy transmission increased with branches Komienergo (5.4%), Novgorodenergo (3.1%), Pskovenergo (4.0%) and Kolenergo (0.2%). Supply reduction was to be observed with branches Karelenergo (-2.5%), Arkhenergo (-2%) and Vologdaenergo (-1.8%).